Matte-black 40-yard roll-off dumpster staged on a framed-out residential construction site in Reno, framing lumber stacked nearby, hooklift delivery truck visible in the background under bright Colorado daylight

Construction dumpster rental in Reno

Need a jobsite dumpster in Reno? Most contractors start with a 30-Yard Roll-Off for full-remodel debris; swap-outs keep the job moving, and driveway boards protect your access.

Jobsite Roll-off Containers for General Contractors

Our heavy-duty fleet serves Reno and Washoe with 20-, 30-, and 40-yard containers built for framers, roofers, and demo crews. These units feature reinforced steel sidewalls, walk-in rear swing doors, and steel bottom rollers to protect surfaces; we always set the roll-off on driveway boards. Call (775) 514-6163 to discuss contractor pricing and tonnage rates for your recurring multi-phase construction projects.

Matte-black 20-yard roll-off construction dumpster with heavy ribbed steel sidewalls and swing rear doors at a working jobsite in Reno, sitting directly on compacted dirt with an unmarked white hauler partially visible at the far edge of the frame.

20-yard construction roll-off

The 20-Yard Roll-Off measures 20 ft x 7 ft x 4 ft and includes 2 tons of debris in the flat rate.

The 20-yard roll-off fits kitchen and bath remodels, single-room demo, and small framing jobs in Reno.

Matte-black 30-yard roll-off construction dumpster sitting directly on the compacted-dirt site of a framed single-family home build in Reno, drywall and lumber scrap loaded inside.

30-yard construction roll-off

The 30-yard roll-off runs 22 feet long, 8 feet wide, and 6 feet tall, with about 4 tons of capacity included.

A 30-yard container handles whole-house remodels, additions, and new-build framing with high walls for bulky drywall and lumber.

Matte-black 40-yard roll-off construction dumpster being lowered from a white-cab hooklift delivery truck onto the compacted-dirt jobsite at a commercial build site in Reno

40-yard construction roll-off

The 40-yard roll-off stretches 22 feet long, 8 feet wide, and 8 feet tall, with about 5 tons of debris included.

Sized for commercial builds and large tear-outs, the 40-yard roll-off is the largest container we stage on jobsites.

Construction Debris, Drywall, Lumber Acceptance

Our construction roll-off containers accept the full range of mixed C&D debris: framing lumber, drywall, plaster, subfloor, insulation, packaging, pallets, and light metals. These loads get sorted at the Reno transfer station—a necessary step for recovery. Contractors on steady jobs often prefer our commercial recurring hauling agreements. For specific material-stream standards, we recommend reviewing the EPA construction debris recycling guidance.

  • Framing lumber and offcuts
  • Drywall, plaster, lath
  • Subfloor and sheathing
  • Insulation and vapor barrier
  • Mixed packaging and pallets
  • Light metals and conduit
Worker in a yellow high-visibility vest tossing framing lumber and broken drywall into a matte-black 30-yard construction roll-off dumpster on an active build site in Reno, bright daylight
Low-profile matte-black lowboy roll-off dumpster loaded with broken concrete slab and rebar at a foundation tear-out in Reno, skid steer parked beside it, sunny Colorado morning

Concrete, Brick, and Asphalt Heavy-debris Pricing

Dense materials aren’t a match for a standard roll-off. Our reinforced-steel lowboy roll-offs are built for concrete slab tear-out, brick demo, asphalt millings, and clean dirt loads up to 10,000 pounds. The low 2-to-3-foot side walls let skid steers and wheelbarrows roll debris over the rim without busting USDOT truck weight limits on Reno routes.

Heavy-debris jobs run on weight tickets from the scale house, not by the yard; clean loads—without mixed wood or trash—earn the lowest per-ton rate. I coordinate the container and dumpster dispatch after talking to your site super, and that means we track all tonnage to keep your costs accurate.

Tonnage Limits and Weight Overage Policy

Each Construction Roll-Off includes a fixed tonnage allowance; the overage rate is billed per-ton based on the scale-house ticket. Your upfront quote lists the weight limit: no surprise fees when the truck weighs in—our dispatch team ensures clarity. Note that shingles are heavy; keep them out of standard debris by choosing roofing tear-off jobsite containers so shingle weight does not eat your allowance.

20-yard

3 tons

Included tonnage. Mixed C&D debris.

30-yard

4 tons

Included tonnage. Mixed C&D debris.

40-yard

5 tons

Included tonnage. Mixed C&D debris.

On-site Swap-out and Dispatch Coordination

Multi-week jobs run on a swap rhythm, not single drops; text or call dispatch when your container is full — and we’ll stage a fresh roll-off to the same pad the same or next business day across the Reno metro and Washoe.

Step 1

Text dispatch when full

Site supers text a photo and the container number to the dispatcher—no portal logins, no ticketing.

Step 2

Same- or next-day swap

We haul the full container and drop the empty on the same staging pad so the crew never loses a loading hour.

Step 3

Weekend dispatch available

Saturday pulls keep Monday starts clean; coordinate Friday afternoon for weekend turns.

Insurance and Contractor Account Setup

We handle contractors and owners in Reno by issuing certificates of insurance on request; contractors get net-30 accounts with consolidated monthly billing across active sites. The hooklift fleet stages recurring bins at job sites — and that means a new account spins up over a single call with dispatch.